24/7 water system monitoring
Confidence and accountability from the outset.
When HVAC systems are constructed it is essential to prevent undue degradation of pipework. Mistakes at this stage could exacerbate future corrosion issues, with precommission cleaning (PCC) a key point where things can go wrong.
Water sampling and analysis, the traditional way HVAC systems are checked, only represents a snapshot in time - results often take days if not weeks to return, leaving M&E contractors open to inaccuracies and potential issues at handover.
Using Hevasure's 24/7 remote monitoring solution through construction and precommission cleaning helps meet the requirements of BG29 2020, providing an accurate real-time picture that avoids serious damage and keeps responsible parties in control. This leads to greater accountability, reduced sampling and less risk of handing over a system with inherent issues.
Benefits include handing over systems in a pristine condition with no corrosion, tracking all events during PCC, commissioning and fit-out, and avoiding delays and disputes at Practical Completion.
Get in touch to find out how Hevasure could help your systems.